USAfixTM - Repair Guide (RG) - Master Email RG
- Check voltage output from brush motor control board
 Level of Difficulty - HIGH  Estimated Completion Time - 15 minutes
TASKI - SWINGO 150

Tools Required
Tool 
Screwdriver-phillips

Parts Required


Step Procedure & Parts & Tools
1 PUSH IN ON THE 2 ORANGE TABS TO REMOVE THE BASE COVER.

2 REMOVE THE BASE COVER.

3 LOOSEN THE BRUSH HEIGHT KNOB AND REMOVE IT. SET IT ASIDE.

4 FLIP THE BASE OVER AND REMOVE THE 5 SCREWS.
Screwdriver-phillips

5 FLIP THE BASE BACK OVER AND REMOVE THE BRUSH MOTOR COVER.

6 PLACE THE VOLT METER LEADS ON THE 2 BLUE WIRES ON THE CONTROL BOARD. PLUG THE MACHINE IN AND TURN IT ON. THE VOLT METER SHOULD READ 120 VOLTS.

7 REVERSE STEPS 1 THRU 5 TO REASSEMBLE THE MACHINE.